Friday, December 30, 2011

House Update

We made another midweek trip to the house yesterday so Nana and Papa could check it out. I am always amazed at how much they are doing in such a short period of time!

The roofers were about halfway done.Kaelin's Gate - Lot 33 (12.29.11) 1 - Copy

The kitchen island has been framed.Kaelin's Gate - Lot 33 (12.29.11) 2 - Copy

The tub in the master bathroom was constructed.Kaelin's Gate - Lot 33 (12.29.11) 3 - Copy

There are now stairs from the garage into the house.Kaelin's Gate - Lot 33 (12.29.11) 4 - Copy

The front door is in the garage and waiting to be installed.Kaelin's Gate - Lot 33 (12.29.11) 5 - Copy