Went to the house today and let’s just say WOW! They were moving and shaking this week! They completed so much, I’m not sure I got everything!! Here’s what’s new…
Exterior: The base of the exterior was painted. The driveway, walkway/steps to the porch and back patio were all poured!
Interior: Doors (rooms and closets), smoke/carbon monoxide detectors, light switch/electrical face plates and all lighting fixtures have been installed!
Kitchen: Most of the cabinets and all of the granite tile have been installed!
Fireplace: Surrounding granite tile
Downstairs Bath: Cabinet, tile countertop & tile floor (floor needs grout)
Railing: White parts are down, wood portions need to be stained
Kid’s bathroom & Laundry Room: Flooring is in
Master Bath: Tub, shower and floor is tiled (everything needs grout).
4.5 weeks till closing!!